We began work on the conceptual design phase of the Gibsons – Roberts Creek Connector in 2024. This work was made possible by a grant from the federally-funded Green Municipal Fund, along with matching funds from local governments, affiliated cycling advocacy groups, and private donors. The work funded included detailed topographic surveying, environmental and archaeological assessment, conceptual engineering design, a class B construction cost estimate, stakeholder and public engagement, and development of a maintenance cost estimate. This work provides us with a much more detailed and accurate picture of how the proposed path will look, what it will take to build, the impact it will have on its surroundings, how key stakeholders and the public feel about the path, and how much the path will cost to build and maintain.